Complete Office Fitouts

Latest articles

Page 28 of 28

Showing 649–650 of 650 · page 28 of 28

  • An office tea point with a sink, a boiling and chilled water tap and a dishwasher beside the open office
    Trades & Services

    Basics of Office Plumbing Services

    Plumbing is one of the less visible parts of an office fitout, but it is also one of the most constrained. Unlike electrical or data cabling, which can be routed almost anywhere through the ceiling void or under the floor, plumbing requires gravity-fed drainage, connections to the building’s water supply and waste stacks, and compliance […]

  • A technician seen from behind testing a ceiling smoke detector with a long pole in an office after hours
    Trades & Services

    Fire Services – What You Need to Know!

    Fire services are one of those parts of an office fitout that tenants rarely think about until they are told that the fire system needs to be modified, recertified, or upgraded as part of their fitout works. The systems are already in the building, they were working before the fitout started, and most tenants assume […]

Call nowGet a quote