A gyprocker is a tradesperson who builds walls and ceilings from plasterboard. In an office fitout, a gyprocker usually builds the steel frames for new walls, bulkheads and ceilings, screws plasterboard sheets to those frames and flushes the joints ready for paint. On a fitout quote, this work usually appears under lines such as plasterboard partitions, bulkheads, ceilings and patching rather than under the trade's name.

Gyprocker is everyday Australian site slang. The name comes from a well-known plasterboard brand, and people use it whichever board is being fixed. Plasterboard fixer, wall and ceiling fixer and drywaller are other names for the same trade. The word plasterer can mean either this trade or a solid plasterer, which is a separate trade.

How a Gyprocker Differs from a Solid Plasterer

A gyprocker works dry, fixing factory-made sheets to a frame. A solid plasterer works wet, building up coats of render and plaster by hand on brick, block or concrete. The painted walls can look alike, but they are built differently and dry at very different rates.

GyprockerSolid plasterer
MaterialsPlasterboard sheets, steel framing and jointing compoundCement render, then a set coat of plaster and lime
Built onA steel frame, or glued to a dry masonry wallBrick, block or concrete walls
How the surface is madeSheets screwed to the frame, then joints taped, coated and sandedCoats trowelled on, ruled flat and trowelled smooth
Before paintingThe finish coat usually needs about a day to dry, longer in cold or humid weatherNew cement render can need four to eight weeks to cure, depending on its thickness and drying conditions
Usual work in an office fitoutNew walls, bulkheads, ceilings, wall linings and repairsRepairs and new render on existing masonry walls

New internal walls in an office are usually steel-framed plasterboard. A solid plasterer is usually needed where an existing rendered brick or block wall is patched or altered, or where the design asks for a render finish. Solid plasterers also restore old plaster walls and cornices.

An existing masonry wall does not always need new render. Plasterboard can be glued straight onto a dry brick, block or concrete wall and flushed like any other plasterboard wall. A plasterboard lining avoids the weeks of curing that new render needs before painting. The masonry has to be dry first, because the lining does not stop damp coming through the wall.

When a Gyprocker Is on Site

A gyprocker usually returns to the same walls several times, because other trades work inside each wall before it is closed. On a fitout programme, the plasterboard work usually follows this order:

  • Frames for the walls, bulkheads and ceilings are set out from the drawings and built.
  • One side of each wall is lined with plasterboard.
  • Cables, pipes, insulation and the backing that wall-mounted items fix to are installed in the open side of each wall.
  • The second side is lined, and ceilings are lined once the services above them are finished.
  • Joints are flushed and sanded, ready for the painter.
  • Holes left by late changes are patched before the final coat of paint.

Lining the second side closes the wall. A power cable or a piece of backing missed before then means cutting into new board and patching it afterwards. Power points, data outlets and the backing for wall-mounted screens need to be confirmed before the second side goes on.

Framing Walls, Bulkheads and Ceilings

In commercial work, the gyprocker usually builds the steel frame as well as lining it. Each wall is built to the wall type on the drawings. The wall type sets the size of the upright steel studs, the plasterboard, the number of layers and any insulation in the cavity.

Where the slab above can bend slightly under load, the top of the wall is built as a deflection head. The studs sit in a deep steel channel fixed to the slab, with room to move up and down. The plasterboard is screwed to the studs but not to that channel. A sheet screwed into the channel would be pushed down as the slab moves, and the board can crack.

Gyprockers also build plasterboard ceilings and suspended grid ceilings, and some specialise in ceilings. A suspended ceiling hangs from the slab on rods, with a light steel frame hung from the rods to carry the plasterboard or tiles. The frame is built around ducts and pipes already in place, with openings left for lights, air grilles and access panels.

A bulkhead is a section of ceiling that drops lower to box in ducts, pipes or a beam. Its frame hangs from the slab on its own supports, like the ceiling frame beside it.

Fixing the Plasterboard Sheets

Each wall type names its board. Standard plasterboard suits most office walls. Fire-rated board goes into walls that need a fire rating, moisture-resistant board into toilets and other wet areas, and impact-resistant board into busy corridors.

The sheets are cut to size, lifted into place and screwed to the studs. Openings for power points and switches are cut as each sheet goes up. Where a wall meets the ceiling, the corner can be finished with a cornice glued along it or with a plain square edge.

Where each joint falls affects whether the wall cracks later. Sheets are cut around each door opening so that no joint lines up with the edge of the frame. A joint in that position is more likely to crack when the wall moves.

Flushing the Joints

Flushing hides the joints and screw heads, so that a wall of separate sheets looks like one smooth surface. The same work is also called setting or stopping.

Each joint is covered with paper tape bedded in a base coat of jointing compound. A second coat and a finish coat follow, then the joint is sanded smooth. Screw heads get the same coats. Exposed corners are first covered with a corner bead, a strip that keeps the corner straight and protects it from knocks.

Each coat has to set or dry before the next goes on. Base coats that harden by chemical setting are usually ready for the next coat in about an hour. The finish coat dries by evaporation and usually needs about 24 hours before sanding, longer in cold or humid weather. The painter starts after the final sanding.

The specification usually names a level of finish, which sets how smooth and even the flushed surface must be. The Australian standard for finishing plasterboard treats Level 4 as the default unless another level is specified. For Level 5, a thin skim coat is spread across the entire surface after the joints are finished. This level suits walls with gloss or dark paint, or walls lit at a low angle from windows or spotlights, where small marks would show.

Fire-Rated and Acoustic Walls

A fire-rated wall is rated as a complete system. Its board, layers, screws and sealant all follow the tested details for that system. The building and the position of the wall decide whether a rating is needed, and the certifier usually confirms it.

Gaps at the edges of the wall and around every pipe or cable passing through it are filled with fire-rated sealant. On an acoustic wall, the same gaps are sealed. Sound escapes through any opening left at the edge.

On a wall with two layers of board, only the outer layer is flushed. On a fire-rated wall, those outer joints are taped and coated even above the ceiling, where nobody will see them. The joint treatment is part of the tested system, so it is not left off the hidden sections.

Patching and Repairs

Gyprockers also repair existing plasterboard. Typical repairs in an office include filling fixing holes left when screens or shelving come down, replacing a ceiling sheet damaged by a leak, and reflushing a cracked joint. We can price a repair as a job on its own, from patching one wall to replacing damaged ceiling sheets.

A crack that keeps reopening usually comes from movement in the building or its frame. Crack repair starts by finding that movement, because a patch over a crack that is still moving splits again. Where the sheet itself is damaged, the damaged section is cut out and replaced with new board.

We can measure the walls and ceilings on site, confirm each wall type and quote the framing, plasterboard and flushing for a complete fitout or a single job.

📞 Call us on 1300 60 93 93

📧 Email info@completeofficefitouts.com.au